Documents, fees and time.
Page data as of 2026-09-29. Anything we have not verified for Maharashtra State Electricity Distribution Co. (MSEDCL) is marked.
Documents
- Latest electricity bill (consumer number)verify
- Identity proof of the connection holderverify
- Bank account details of the connection holderverify
- Photos of the installed systemverify
- DCR certificate for the panelsverify
Fees and time
Fees: ₹500. Registration fee ₹500 for a low-tension home with sanctioned load or contract demand up to 20 kW: MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations 2019, dated 30-12-2019, Reg 9.1 (pp.9-10), "Provided that the Commission may stipulate such other amount through Schedule of Charges of the Distribution Licensee". MERC's 2023 and 2024 amendments do not change it, and the Practice Direction of 30-06-2026 drops only the separate physical agreement for PM Surya Ghar. MSEDCL's meter and testing charges were not found; ask the sub-division in writing. Read 29-09-2026.
Typical days: to verify. To verify from DISCOM data or installer reports.
Tariff on file: FY 2026-27, verified.
Official portal (National portal. DISCOM's own rooftop page to verify.)
- 1Registered · रजिस्टर करेंRegister on the PM Surya Ghar national portal with the consumer number from the electricity bill.
- 2Feasibility · फ़िज़िबिलिटीThe DISCOM checks the connection and sanctioned load and approves feasibility.
- 3Vendor selected · वेंडर चुनेंThe consumer picks an empanelled vendor on the portal.
- 4Agreement · एग्रीमेंटThe consumer approves the agreement with the vendor on the portal.
- 5Installation · इंस्टॉलेशनThe vendor installs the system and uploads photos and details.
- 6Net-meter request · नेट-मीटर रिक्वेस्टA net-meter is requested from the DISCOM after installation.
- 7Inspection · इंस्पेक्शनThe DISCOM inspects the installation and the meter.
- 8Commissioning · कमीशनिंगThe DISCOM issues the commissioning certificate on the portal.
- 9Subsidy · सब्सिडीThe central subsidy is credited to the consumer's bank account.
On the blog
The full write-up on the MSEDCL net-meter process: MSEDCL net-meter process and what rooftop solar saves on a Mahavitaran bill
Track every net-meter request.
Raymitra shows each application's stage and days pending, per DISCOM.
- +91 88154 11655
- hello@raymitra.com
- Made in India