Sources and dates
Built by Raymitra from India Post's 3-digit sorting districts and each DISCOM's published service region (state-level knowledge), for the DISCOMs that have a guide in content/discoms only. A prefix is listed only where the whole sorting district falls in one DISCOM's region, or where the overlap is known and both DISCOMs are named ('shared'). Every other prefix answers 'not in our list yet'. Not checked against DISCOM consumer data; the name printed on the electricity bill always wins. Table as of 2026-09-27; not verified against DISCOM data.
Quotes from empanelled installers near you.
We pass your request to PM Surya Ghar empanelled installers in your district. Raymitra is new, so this can take a few days.
More calculators
- Subsidy calculatorसब्सिडी कैलकुलेटरBill in, subsidy, net cost and payback out.
- Solar cost calculatorसोलर का खर्चCost of 1 to 10 kW by state, with GST.
- Application riskआवेदन कितना पुराना?Days pending on one application, and what to do.
- Vendor 60-day checkवेंडर 60-दिन जाँचPaste application dates. See which are at risk.
- Solar loan EMIसोलर लोन की EMIMonthly instalment on the net cost, flat or reducing.
- Net-meter guidesनेट-मीटर गाइडSteps and documents per DISCOM.
