Skip to content
Raymitra
Net-meter guide · Gujarat

Torrent Power, Surat: net-meter, step by step.

नेट-मीटर कैसे लगवाएँ, स्टेप बाय स्टेप

Generic PM Surya Ghar flow. Torrent's PM Surya Ghar net-meter fee is not confirmed for Surat: its charge sheet covers Ahmedabad only, so ask the Surat office in writing. Local office details and typical days are still to be confirmed.

  1. 1Registered · रजिस्टर करें
  2. 2Feasibility · फ़िज़िबिलिटी
  3. 3Vendor selected · वेंडर चुनें
  4. 4Agreement · एग्रीमेंट
  5. 5Installation · इंस्टॉलेशन
  6. 6Net-meter request · नेट-मीटर रिक्वेस्ट
  7. 7Inspection · इंस्पेक्शन
  8. 8Commissioning · कमीशनिंग
  9. 9Subsidy · सब्सिडी
Before you apply

Documents, fees and time.

Page data as of 2026-09-29. Anything we have not verified for Torrent Power, Surat is marked.

Documents

  • Latest electricity bill (consumer number)verify
  • Identity proof of the connection holderverify
  • Bank account details of the connection holderverify
  • Photos of the installed systemverify
  • DCR certificate for the panelsverify

Fees and time

Fees: Not confirmed. Torrent's PM Surya Ghar (MNRE scheme) charge sheet is titled "Ahmedabad" only, and the older ₹4,270 sheet for "Ahmedabad and Surat" is for the earlier Surya Gujarat scheme. Looked for on Torrent's solar guide page on 29-09-2026. Ask Torrent's Surat office for the amount in writing.

Typical days: to verify. To verify from DISCOM data or installer reports.

Tariff on file: FY 2026-27, verified.

Official portal (National portal. DISCOM's own rooftop page to verify.)

  1. 1Registered · रजिस्टर करेंRegister on the PM Surya Ghar national portal with the consumer number from the electricity bill.
  2. 2Feasibility · फ़िज़िबिलिटीThe DISCOM checks the connection and sanctioned load and approves feasibility.
  3. 3Vendor selected · वेंडर चुनेंThe consumer picks an empanelled vendor on the portal.
  4. 4Agreement · एग्रीमेंटThe consumer approves the agreement with the vendor on the portal.
  5. 5Installation · इंस्टॉलेशनThe vendor installs the system and uploads photos and details.
  6. 6Net-meter request · नेट-मीटर रिक्वेस्टA net-meter is requested from the DISCOM after installation.
  7. 7Inspection · इंस्पेक्शनThe DISCOM inspects the installation and the meter.
  8. 8Commissioning · कमीशनिंगThe DISCOM issues the commissioning certificate on the portal.
  9. 9Subsidy · सब्सिडीThe central subsidy is credited to the consumer's bank account.

On the blog

The full write-up on the Torrent Surat net-meter process: Torrent Power net-meter process, step by step

Next step

Track every net-meter request.

Raymitra shows each application's stage and days pending, per DISCOM.

  • +91 88154 11655
  • hello@raymitra.com
  • Made in India